Mine Site Demolition for Alcoa | Wagerup & Southwest WA
Case Details
Clients: Alcoa Australia
Alcoa Australia
Scope: Demolish, houses, sheds and infrastructure on mining leases
Equipment: 25t Excavator, 950 Loader, Water Cart, Positrack, Semis
Period: 2023- current
Let’s Work Together
Call us directly, or email us!
Address Business
Contact With Us
(08) 9531 3444
admin@peelresource.com.au
PO Box 222 Pinjarra WA 6208
Alcoa Mining Lease Demolition: Structures Safely Removed
As WA’s leading mine site demolition contractors, Peel Resource Recovery has been delivering comprehensive demolition services for Alcoa Australia across their Wagerup, Waroona, Yarloop, and Orion mining leases since 2023. Our specialized team has safely removed structures including houses, sheds, and industrial infrastructure while maintaining a perfect safety record of zero LTIs. The project features rigorous hazardous material management, including asbestos identification and heritage assessments, coupled with advanced dust suppression. What sets our mine site demolition contractors WA apart is our certified equipment, soft-terrain positracks for challenging conditions, and full DMIRS compliance – delivering Alcoa both sustainable outcomes and operational efficiencies in Southwest WA’s demanding mining environments.
Project Highlights:
- Structures demolished: (houses, sheds, infrastructure)
- Locations: Wagerup, Waroona, Yarloop, Orion mining leases
- Duration: 2023 – current (ongoing)
- WA’s trusted mine site demolition contractors