Bunbury Outer Ring Road Infrastructure Demolition Project
Case Details
South West Gateway Alliance
Location: BORR – Bunbury Outer Ring Road
Scope: Demolish and remove 14 houses, sheds and infrastructure along new road alignment
Equipment: 25t Excavator, 950 Loader, Water Cart, Positrack, Semis
Period: 2023-current
Let’s Work Together
Call us directly, or email us!
Address Business
49 Munday Avenue Pinjarra WA
Contact With Us
Call us: (08) 9531 3111
(08) 9531 3444
admin@peelresource.com.au
PO Box 222 Pinjarra WA 6208
(08) 9531 3444
admin@peelresource.com.au
PO Box 222 Pinjarra WA 6208
Enabling Bunbury’s Critical Infrastructure Development
Peel Resource Recovery was selected by the South West Gateway Alliance (SWGA) as lead demolition contractor for the Bunbury Outer Ring Road (BORR) project, removing 14 houses, sheds, and infrastructure along the new alignment since 2023. This complex urban demolition required precise coordination with major construction teams.
Key Project Details
- Structures Removed: 14 (12 houses + 2 commercial sheds)
- Materials Processed: 8,500+ tonnes of demolition waste
- Location: 5km stretch of BORR alignment
- Duration: Ongoing since Q2 2023
Equipment Profile
- 25t Excavators: 3 units with pulverizer attachments
- 950 Loaders: 4.2m³ bucket capacity
- Water Carts
- Semi Trailers: B-double configurations