Mining Lease Demolition for South32 Worsley Operations

Case Details

Clients: South 32

Location: Worsley / Hotham

Scope: Demolish houses, sheds and infrastructure on mining leases

Equipment: 25t Excavator, 950 Loader, Water Cart, Positrack, Semis

Period: 2024-current

Let’s Work Together

Call us directly, or email us!

Address Business
49 Munday Avenue Pinjarra WA
Contact With Us
Call us: (08) 9531 3111
(08) 9531 3444
admin@peelresource.com.au
PO Box 222 Pinjarra WA 6208

Project Overview

Peel Resource Recovery is currently delivering high-risk, large-scale mining site demolition services in Western Australia for global mining leader South32. This strategic project, located across the Worsley and Hotham mining leases, involves the controlled demolition and removal of residential and industrial infrastructure to support future mining operations and environmental rehabilitation.

Demolition activities began in 2024 and are ongoing, with Peel Resource Recovery deploying modern equipment and highly skilled personnel to manage all aspects of this sensitive demolition scope.

With strict adherence to safety, environmental protection, and mine site protocols, this project reinforces PRR’s reputation as a trusted provider of mining site demolition services in WA.

Key Project Features

  • Removal of legacy residential and mining infrastructure
  • Work delivered under active mining lease conditions
  • Strict safety and environmental compliance protocols
  • Coordination with South32’s site operations team
  • Reuse and recycling of demolition materials wherever feasible

Equipment Profile

  • 25t Excavators: Mine-spec cabs and attachments
  • 950 Loader
  • Water Carts
  • Positracks: Soft terrain mobility
x

Discover how Peel Resource Recovery’s comprehensive services and extensive expertise can add value to your next project.

Address Business
49 Munday Avenue Pinjarra WA
Contact With Us
(08) 9531 3111
(08) 9531 3444
Working Time
Mon - Sat: 8.00am - 18.00pm
Holiday : Closed