Shire of Nannup Gravel Crushing | 20,000t 38mm Spec Delivery
Case Details
Clients: Pixel Art Company
Location: Various – Nannup Shire
Scope: Crush > 20,000 tonne of 38mm minus gravel to spec
Equipment: Impact Crusher, Screener, D9 Dozer, 36t Excavator, 966 Loader
Period: 2023
Supporting Nannup Shire’s Infrastructure Development
Peel Resource Recovery partnered with the Shire of Nannup to produce 20,000+ tonnes of 38mm minus specification gravel for critical road and drainage upgrades across the region in 2023. This project demonstrated our capability to deliver high-volume materials to exacting standards in Southwest WA’s unique conditions.
Key Project Details
- Volume: 20,000 tonnes processed
- Specification: Consistent 38mm minus gravel
- Locations: Multiple sites across Nannup Shire
- Duration: Completed within 6-month window
Equipment Profile
- Impact Crusher: High-tonnage processing
- Screener: 3-deck system for exact grading
- D9 Dozer: 410kW power for tough conditions
- 36t Excavator: Precision feed control
- 966 Loader: 4.5m³ bucket capacity